Remodeling Update - Week Two

 We are now 2 weeks into the remodel of our first floor and daily changes begin to happen.  We spoke to the contractor, and things will take a bit of a slow down soon as we wait for the next steps to be able to happen.  So far our house has been an active construction zone from 7am-4pm each day, but we don't mind.  We love going into the first floor area after the contractors leave for the day and discovering what has changed.  We have been photo journaling the changes so that we can always remember the process.  

First - for dust and Covid protocol - the contactors have walled themselves in. We are able to go up and down to our second floor completely separated by the workers, which has been excellent.

They have now taken down more walls and supports from where the old kitchen was and where the new one will be.  Only this small area remains to be moved by the plumber

They took down the last of the walls in the upcoming mudroom early in the week.  Those three doors in a row look weird in this view, but soon this space will be broken up by new walls
Look at that now - no more wall.  The middle door there is to Mat's office.  The door on the left is to the garage, and the door out of the picture on the right is to our backyard.
The walls and doors that were to the small pantry we had are gone!  This area will become built ins (eventually) in the mudroom.
They have closed off the windows and framed them for the new windows that will be installed.  This area had to be raised since it is where the dishwasher, cabinets, and sink are going.  Before it was just a bay window.  The floor also had to be raised to support all that weight.
By mid week the pantry was framed!  This was so exciting.  We are putting in an 11 foot pantry with cabinets and shelving - my dream!  It is going to be amazing.  It is right in front of the fire place
This is the doorway that is going into the pantry from the mudroom.  We are going to install a door on this side so that we can close off the pantry from the mudroom when we have guest.  But it will be nice to have a pass through when we come in with groceries from the garage.
Me in the pantry!
There will be a small window in the pantry.  We had a large three framed window that was here, and we really didn't want to change the layout of the outside of the house by closing it off.  Too costly.  So we are keeping part of the window and the contractors will box it in and build a nice shelf from the window to the counter.
How our windows look from the outside.  They will both shrink significantly

We had a leak that was occuring a few weeks before the remodel started (thankfully before and now after it was complete is how I look at it) from a pipe in the upstairs kid's bathroom.  The plumbers have discovered where it was and had to make two holes in the kid's bathroom walls to fix it.  The part has been ordered, and we are grateful that it will be resolved quickly.
The contractors gave us the great news that we will NOT need posts in the living room to support the beam - that we will be able to have the open concept we desired with thicker LVL beams.  YAY.  We signed off that with a big YES PLEASE - and the contractors built temporary walls in the living room to place those enormous beams.

The doorway into the mudroom got framed.  We are starting to see that space come alive
Midweek they also finished framing the doorway into the pantry from the mudroom.  The two small framed areas on either side are going to be recessed for storage/knicknacks.  That was Mat's idea.
Looking into the mudroom from the pantry
Beam one goes in. It is HUGE.  It is spaning the entire length of our living room and it has been facinating to watch how it all works.
They support the beams like the picture below while they get everything in place
Near the end of the week the last of the plumbing was removed from the area that used to be the backwall of the old kitchen.  We are SO CLOSE to having the last of the walls down.
They finished framing the doorway from the kitchen into the pantry.  We decided to make the doors into and out of the pantry taller than the average door since they will be mostly openings.  Wanted the space to look as big as possible.
Most of the plumbing has been rerouted.  We only had to be one day without water - and only for a few hours.  They did a great job of not inconveniencing us.  With the kids at school we hardly noticed.  The new plumbing is all Pex - bendable and plastic - it is wild.
At the end of the week beam one has been secured and the temporary walls come down.  I cannot tell you how amazing it is to see that space.  It is HUGE.
Beam two goes in and will be connected with a U shaped metal piece to connect one beam to the other and they are supported on both ends.
During the week I went with the designer to pick our soap stone.  We are securing 4 pieces of stone, but probably only need three.  We chose soapstone for a number of reasons: It is evironmentally friendly, it is locally mined, it can take a lot of abuse, and nothing stains it.  Plus - I really didn't want granite.  I wanted something different.  It is more us.  It is gray when it comes out of the earth and you can either leave it gray, or oil it to turn it black.  Our plan at this point is to oil it.  But look at it - isn't it gorgeous?  We needed a huge piece for our island, and were very excited to find they had enough to do one solid slab for that.
The stoneyard put a little oil on it to show us what it would look like black.

On Friday the last of the support walls came down and we have a complete open concept in our living room.  I wanted the pantry and Mat wanted this.  It is not easy to describe or photograph the difference from what we had
This is how the two beams were secured.
The look from the living room into the kitchen area.  That central vac piece there on the floor to the left will be gone - they just haven't moved it yet.
What I will see from my sink area































Thursday, April 1, 2021

First Floor Remodel Begins

 Our first floor remodel has begun!  We are nearing the end of our first week of construction (or shall I say DEstruction) and it is an amazing difference already.  I took some pictures prior to the knock down and took some today for comparison.  I cannot wait to watch the daily change

Our biggest sight line wall comes down. This was our favorite. We cannot wait until the beam is in and we can see the complete open concept

Our kitchen cabinets and counters were all donated to charity.

This will be our new mudroom

This was our dining room. Those windows are being raised and this will be part of the kitchen. Sink will go under middle window

Taking down the walls allows us to expand the kitchen

Our living room will now open to our kitchen




Saturday, March 27, 2021

Newest Karate Green Belt

 Cainan was promoted to Green Belt today!  I love that he has stuck with Karate since the age of 4 - even while we lived in Switzerland.  I am glad he found the sport for him.




Tuesday, March 16, 2021

Skateboard Queen

 Finley had decided she would like to learn to skateboard.  It is always reassuring to a mother when her vision impaired child picks "trickier" things to learn.  We already had a skateboard and the helmet, so today she headed out into the driveway to give it a try

We don't say no to Finley for most things.  We want to encourage her to try things even though the thought gives me pause because of her vision difference.  I want her to build confidence that there shouldn't be much that stands in her way



Thursday, March 11, 2021

Covid Vaccine

 I have officialy been fully vaccinated again Covid.  Because of my work with the Pool testing as a nurse, I was eligible now for the vaccine.  I had my first dose a month ago and today I got my final dose of the Moderna vaccine.  I am so glad to have this behind me knowing that in two weeks I will be covered completely.  My parents have been vaccinated as well, so slowly but surely we are getting there!



Wednesday, March 10, 2021

Figuring out the kitchen layout

 For months we have been working with our architect on the kitchen project, and our start date is getting near.  We are going to start the last week of March so final plans are being made.

Today I taped up the areas where things will be because I wanted to have a bit of a visual on how the new layout will look.  It was fun, and now I have a better idea of where things will be.

Sink area with island and bar area. The window along the back wall will be staying - just being raised and reframed. The sink will be under the middle window - dishwasher to the left. Bar is there to the right - it will hold 4 chairs. And the square at the bottom of this picture is the other half of the island.

Edge of pantry and fridge and start of island. So on our current island the tape represents the end of our pantry and the beginning of the fridge. And then there is a 3 1/2 foot gap and that starts the island. The wall where the oven (in the picture) is will be GONE. Kitchen will extend into the next room

Edge of the mudroom and start of the pantry. Wall there where the shoes are be gone. To the left is a closet right now that will be turned into open lockers for coats and shoes. There will be a doorway into the mudroom, and then a doorway intothe pantry.

We are building in an area for bookcase in front of the pantry. We are putting that in ourselves (we are taking all the millwork on after the project is over so that I can see the spaces and design after the kitchen and pantry are complete) We have a large fireplace, so our architect wanted to make sure she drew it into the design so that it was positioned correctly. We are getting all new floors to match the upstairs as well.

Island, back wall of cabinets and sink and bar sink. All these walls gone






Gigi's Raviolis

 There is no doubt that my grandmother Appolonia was an amazing cook.  Her Italian food was second to none and I miss watching her work in the kitchen.

Luckily she passed some of those skills down to my mom and now my mom is passing them to me and the kids.  We have learned to make my grandmother's ravioli.  The recipe makes enough to feed a small army, so we are stacking our freezer for when our kitchen gets remodeled.

The kids did a great job and were troopers in making so many